Skip to content

Installation

A CORE system is a solar panel on a bracket, a CORE battery mounted to the bracket or the pole, and two cable connections. This page follows the instruction sheet packed with the V102 (opens in a new tab), V107 (opens in a new tab) and V112 (opens in a new tab) batteries (download the PDF). The three batteries install the same way and differ in capacity and length.

The battery ships with its cables fitted: two MC4 cables for the solar panel and one power output cable. The L brackets, bracket bolts and battery rails on the back are the mounting hardware.

CORE battery with its MC4 cables, power output cable, L brackets, bracket bolts and battery rails labelled

The CORE batteries can be charged from AC / mains power using the DC Constant Current Charger (C312 (opens in a new tab)). The battery has a maximum power point tracking (MPPT) charge controller, which adjusts the input voltage to find the solar panel’s maximum power point. If you try using a standard, constant voltage charger, it won’t work.

Connect the output cable to the battery to turn it on.

Instructions are included with the bracket. Which bracket you have depends on the system size.

BracketSystemsInstructions
BK108 (opens in a new tab)25W (opens in a new tab) and 50W (opens in a new tab) COREBK108 assembly instructions (PDF)
BK110 (opens in a new tab) and BK111 (opens in a new tab)100W (opens in a new tab) and 200W (opens in a new tab) COREBK110 and BK111 assembly instructions (PDF)

In every position, the battery’s cables point down. That keeps water running away from the glands.

Remove the long bolts from the back of the battery. Line the battery up on the bracket so the L brackets line up with the holes. The L brackets slide along the battery rails if they need to shift. Reinsert the bolts and tighten the flanged lock nuts.

V107 battery bolted to the BK110 bracket behind the panel, with the four bolts and four flanged lock nuts labelled

With the upper bracket bolt in place, hang the battery on the hook on the bracket. Pass the second bracket bolt through and tighten both bolts. The battery’s wires face down.

Three views of a battery hung on the BK108 bracket: hooked on the upper bolt, second bolt passed through, both bolts tightened, with the wires facing down

Remove the bracket bolts. Strap the battery to the pole with stainless steel straps passed through the L brackets on the back of the battery. Confirm the solar panel cables reach the battery before you tighten the straps. The battery’s wires face down.

V112 battery strapped to a pole below the panel bracket, with the battery wires facing down

Connect the power output cable to your device first, then the solar panel. Connecting the power output cable turns the battery on, and the charge controller light turns orange. If your system has Power over Ethernet, see PoE below.

With the power output cable connected and the charge controller on, connect the MC4 solar panel cables. They are keyed to the positive and negative connections, so push each one until it clicks. Outside in the sun, the green light on the charge controller blinks to show it is charging.

Battery with the power output cable connected first and the two MC4 solar panel cables connected second

Bundle the cables neatly and zip tie them to the bracket so they can’t move in the wind.

If the battery is mounted horizontally, leave a drip loop in the solar panel and power cables so water runs off the loop rather than into the glands.

Three cable routings on a horizontal battery: two with a drip loop below the glands marked correct, one with cables running straight up marked wrong

The charge controller lights show through the front of the battery. Green is the charging state, amber is system on or low battery, and red is no output or a protection fault. The full table is on the Troubleshooting page.

Scan the QR code on the side of the battery to see its status: charge level, solar panel output and device power output. See System Monitoring for the dashboard.

Battery with the monitoring QR label on its side

The C304 regulator (opens in a new tab) converts the battery’s unregulated 12V output to 5V. It is available with a USB-C or a Micro-USB connector.

C304 5V regulator fitted in line with the battery's power output cable

A Power over Ethernet (PoE) injector, the C403 (opens in a new tab), can be installed inside the battery enclosure on request. The injector has a power port and a data port.

Connect the power cable or cap, then the solar panels. As in Step 3, the cap or power cable turns the charge controller on and the orange light comes on. The green light blinks once the solar panels are connected outside in the sun.

PoE battery with the MC4 cables, the power output cable or cap, and the data output cable or cap labelled

Connect the Ethernet cables. Two compatible cables are included. If you need more length, use outdoor-rated patch cables without a strain relief or boot, because not every Ethernet cable fits through the waterproof housing. Remove the caps on the PoE ports, pass the cable through the housing, reassemble the housing and tighten it securely.

If you don’t use the data port, plug it to keep water out.

Two views of the PoE ports: one with an Ethernet cable passed through the waterproof housing, one with the unused port plugged

We recommend U-bolts or ¾-inch stainless steel straps for the 25W and 50W CORE systems. For 100W and 200W systems, we recommend steel straps.

Hose clamps with a worm gear are inexpensive and easy to use, but can corrode and fail under high loads.